Grid connection and power quality

A connection that holds, and a measurement campaign that ends in an action.

Talk to an engineer

Shore power and battery sites often sit on a connection that was not built for the peaks. Drives trip, harmonics rise, and the study comes back as a report with no next step.

On a vessel the same questions show up against class rules, with the shore connection or the ship itself as the network.

What we do

Grid connection
G99 connection to the distribution operator, typically Type B or C at 11–33 kV, including the application, the compliance evidence and witness testing.
Protection
Interface protection and loss-of-mains, with settings agreed for that connection.
Response
Reactive power, voltage and frequency response, scaled to the module type.
Constrained connections
Battery buffering and export limitation to G100, so shore power can be delivered without waiting for reinforcement.
Power quality
Harmonic, impedance, transient and stability studies on AC and DC networks. Measured on site, checked against a model, and closed with an action.

Standards and platforms

  • EREC G5/5 and P28
  • G99 and G100
  • IEEE 1547
  • Class rules from DNV, Lloyd's Register and Bureau Veritas

Grid-connection experience on the team includes work at National Grid in the UK. National Grid is not a 4M Controls client.

Where this shows up

A short call is the first step

You speak directly to the engineers who do the work.

Contact the team