Grid connection and power quality
A connection that holds, and a measurement campaign that ends in an action.
Shore power and battery sites often sit on a connection that was not built for the peaks. Drives trip, harmonics rise, and the study comes back as a report with no next step.
On a vessel the same questions show up against class rules, with the shore connection or the ship itself as the network.
What we do
- Grid connection
- G99 connection to the distribution operator, typically Type B or C at 11–33 kV, including the application, the compliance evidence and witness testing.
- Protection
- Interface protection and loss-of-mains, with settings agreed for that connection.
- Response
- Reactive power, voltage and frequency response, scaled to the module type.
- Constrained connections
- Battery buffering and export limitation to G100, so shore power can be delivered without waiting for reinforcement.
- Power quality
- Harmonic, impedance, transient and stability studies on AC and DC networks. Measured on site, checked against a model, and closed with an action.
Standards and platforms
- EREC G5/5 and P28
- G99 and G100
- IEEE 1547
- Class rules from DNV, Lloyd's Register and Bureau Veritas
Grid-connection experience on the team includes work at National Grid in the UK. National Grid is not a 4M Controls client.