Test and validation

The controller is tested against a real-time model before the machine exists.

Talk to an engineer

Control faults found at factory acceptance, commissioning or sea trials are late, and some of them are unsafe to provoke on the real machine.

We run the controller against a real-time model of the vessel, the machine or the battery, and we inject the faults on the bench.

What we do

MiL, SiL and HiL
Model-in-the-loop, software-in-the-loop and hardware-in-the-loop. The controller runs against a plant model on a Speedgoat Performance real-time target.
Faults on the bench
Edge cases and failure modes, simulated. Recorded duty cycles can be replayed, to build a digital twin or to reproduce a field issue.
Four benches
HiL, BMS HiL, PLC, and a battery cell emulator. The cell emulator and the energy-management HiL are in Lisburn. A HiL rig is in Prague.
Cell emulator
An NGI N9000 stands in for the cells with a controlled voltage on every wire. A weak cell, a loose wire or a fault is injected from the wires in to the decisions out.
Interfaces
Analogue, digital and CAN, Modbus TCP and RTU, and EtherCAT.

We are working towards DNV-ST-0373, which certifies the hardware-in-the-loop test programme, not the product. Certification of the Muirfinn test programme is planned from January 2027. The standard does not, by itself, change the scope of a sea trial. That is for the class society to agree on each project.

Where this shows up

A short call is the first step

You speak directly to the engineers who do the work.

Contact the team